Hero Background

Case Study:
The Peninsula London

Glider provided HSH with end-user BIM consultancy services and build a digital delivery platform for The Peninsula Hotel London

Expanding its Peninsula group of hotels, The Hongkong and Shanghai Hotels Limited opened its first British hotel. It is located between Hyde Park Corner and Wellington Arch in London and opened in September 2023. The scheme, which received planning consent in April 2016, replaced the 1950s and 1960s offices at 1–5 Grosvenor Place.

Glider was selected by HSH to provide end-user BIM consultancy services. We built a digital delivery platform for the project, so they could store and manage the asset information for the lifecycle of the hotel.

Glider worked with the development team and construction manager to deliver structured asset data in the form of COBie and developed a Digital Strategy for HSH to connect to multiple systems to enhance the digital solution with gliderbim® at its core.

This 189-bedroom luxury hotel, which was designed by Hopkins Architects, opened in September 2023.